How to Build a Swimming Pool in India: A Complete Construction Guide

Published on Feb 03, 2026
Michezo Sports Infra



Planning to build a swimming pool in India? Whether it’s for a private home, villa, apartment complex, school, resort, or hotel, swimming pool construction requires careful planning, the right materials, and expert execution.

Many people underestimate the complexity involved in building a swimming pool in India from soil conditions and waterproofing to filtration systems, safety norms, and long-term maintenance. Without the right approach, costs can escalate quickly and performance issues can appear over time.

In this guide, we break down how to build a swimming pool step by step, explain the construction process followed in India

Step 1: Pool Design, Planning & Layout Marking

This is where your pool takes shape on paper and on the ground.

This stage ensures alignment between homeowners, architects, and swimming pool contractors, setting the foundation for accurate pool construction.

Step 2: Excavation 

Excavation is when the project becomes real.

  • Heavy machinery shapes the pool cavity

  • Soil conditions are assessed

  • Levels and depths are set precisely

  • Excavation approvals and permits are processed

Step 3: Steel Reinforcement Installation

This stage forms the structural skeleton of the pool.

  • Steel bars are bent and tied to shape the pool

  • Reinforcement supports water pressure and soil load

  • Precision placement ensures crack resistance

This step plays a major role in swimming pool construction cost, especially for commercial swimming pool builders and large-scale projects.

Step 4: Plumbing & Electrical Works

One of the most critical phases of swimming pool construction.

  • Circulation lines and drainage systems installed

  • Skimmers, main drains, and returns positioned

  • Electrical conduits for lighting and automation

  • Provision for water features and jets

This stage determines water quality, efficiency, and long-term operating performance key factors in pool construction.

Step 5: Shotcrete / Concrete Shell Formation

Now the pool becomes a permanent structure.

  • Pressurised concrete is sprayed onto steel

  • Pool shape, steps, and edges are sculpted

  • Structural curing begins

This step defines the pool’s strength and lifespan and is a major component of construction cost for swimming pool projects.

Step 6: Waterproofing, Tiles & Decking

Once the shell is ready, finishing begins.

For indoor pool construction, additional waterproofing measures are included, handled by specialist indoor swimming pool builders.

Step 7: Interior Pool Finish Application

This is what gives the pool its final look and feel.

  • Smooth interior coating applied

  • Surface finished for comfort and durability

  • Pool immediately filled with water

This phase transforms construction into a usable swimming pool.


Step 8: Pool Start-Up & Equipment Testing

Before use, the pool is carefully tested.

Step 9: Final Deck Coating & Detailing

The surrounding area gets its finishing touch.

  • Deck surfaces sealed or coated

  • Final detailing and cleaning

  • Safety checks completed

This stage enhances durability and visual appeal.

Step 10: Landscaping & Project Completion

The final transformation begins.

  • Landscaping around the pool

  • Outdoor lighting and finishes

  • Final inspection and handover

At this point, the swimming pool construction company officially completes the build.


Build Your Swimming Pool with Michezo Sports Infra

At Michezo Sports Infra, we specialise in end-to-end swimming pool construction in India from concept and design to execution and commissioning. Our approach combines engineering precision, quality materials, and long-term performance, ensuring every pool is built to suit its purpose, site conditions, and usage.

Whether you’re planning a residential swimming pool, school or academy pool, or a commercial facility for hotels and resorts, our team delivers solutions that balance functionality, safety, and aesthetics.


Disclaimer

The information provided in this article is for general guidance purposes only. Actual swimming pool construction methods, specifications, timelines, and costs may vary depending on factors such as site conditions, soil type, location, design requirements, materials selected, and local regulations.

Final construction details should always be determined after site inspection, technical evaluation, and detailed design planning by Michezo Sports Infra or an authorised project consultant.